04Sep Construction of Science Research Facility, Philippine Science High School – Central Visayas Campus Construction of Science Research Facility, PSHS CVisC Construction of Science Research Facility, PSHS CVisC Construction of Science Research Facility, PSHS CVisC Construction of Science Research Facility, PSHS CVisC
04SepNovember 13, 2024 Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System Design and Build of the Getafe Waterworks and Distribution System
04SepNovember 13, 2024 CONSTRUCTION OF TMC SCHOOL BUILDING – Trinidad Bohol CONSTRUCTION OF TMC SCHOOL BUILDING CONSTRUCTION OF TMC SCHOOL BUILDING CONSTRUCTION OF TMC SCHOOL BUILDING CONSTRUCTION OF TMC SCHOOL BUILDING CONSTRUCTION OF TMC SCHOOL BUILDING CONSTRUCTION OF TMC SCHOOL BUILDING CONSTRUCTION OF TMC SCHOOL BUILDING CONSTRUCTION OF TMC SCHOOL BUILDING CONSTRUCTION OF TMC SCHOOL BUILDING
04SepSeptember 4, 2024 INITIAL LAND DEVELOPMENT IN PREPARATION OF TMC OVAL – Trinidad Bohol INITIAL LAND DEVELOPMENT IN PREPARATION OF TMC OVAL INITIAL LAND DEVELOPMENT IN PREPARATION OF TMC OVAL INITIAL LAND DEVELOPMENT IN PREPARATION OF TMC OVAL
16AprApril 16, 2024 CONSTRUCTION OF CARRASCAL SYSTEMATIC DRAINAGE IMPROVEMENT PROJECT (PHASE II) Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay Activities: • Demolition and Disposal of Demolished Road Pavement @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Excavation of Natural Ground @ Sta. 0+160.00 – Sta. 0+220.00, Brgy. Baybay • Laying of 8pcs Pre-Cast Drainage Canal @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars and Formworks for Pre-Cast Dowel Joints @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Concrete Pouring of Pre-Cast Dowel Joints and Flooring @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Backfilling of Excavated Material @ Sta. 0+141.98 – 0+220.00, Brgy. Baybay • Installation of Formworks and Falsework for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Installation of Rebars for Drainage Canal Top Slab @ Sta. 0+160.00 – Sta. 0+167.91, Brgy. Baybay • Pouring of Concrete for the Restoration of Affected Road @ Sta. 0+130.42 – Sta. 0+154.04, Brgy. Baybay • Fabrication & Installation of Formworks for Drainage Canal Cover @ Site Office • Fabrication & Installation of Rebars for Drainage Canal Cover @ Site Office • Pouring of Concrete for Drainage Canal Cover @ Site Office • Pouring of Lean Concrete on Pre-Cast Drainage Sidings for Drainage Cover @ Sta. 0+167.91 – Sta. 0+220.00 • Housekeeping • Installation of Safety Signages @ Brgy. Embarcadero – Brgy. Baybay
16AprSeptember 5, 2024 CONSTRUCTION OF WATER SUPPLY SYSTEM AT BRGY. OVERLAND, BUENAVISTA, BOHOL Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars
09Jan PROPOSED MOALBOAL BULK WATER SUPPLY (PHASE II) PROPOSED MOALBOAL BULK WATER SUPPLY (PHASE II) ACTIVITES: Tuble: *Excavation – 88ln.m *Breaking of Hard Rock *Concrete cutting of pavement *Sand bedding *Pipelaying of 3″ HDPE Pipe- 78 ln.m *Pipelaying of 4″ HDPE Pipe- 114 ln.m *Backfilling *Laying of Warning Tape Basdiot: *Excavation- 28.47 ln.m *Breaking of Hard rock *Concrete cutting of pavement *Sand Bedding *Pipelaying of 6″ HDPE Pipe- 120 ln.m *Backfilling *Laying of Warning tape Lanao: *Excavation works 3″ HDPE Pipe – 115 ln.m *Excvation works 2″ HDPE Pipe- 189.70 ln.m ACTIVITES: Tuble: *Excavation – 88ln.m *Breaking of Hard Rock *Concrete cutting of pavement *Sand bedding *Pipelaying of 3″ HDPE Pipe- 78 ln.m *Pipelaying of 4″ HDPE Pipe- 114 ln.m *Backfilling *Laying of Warning Tape Basdiot: *Excavation- 28.47 ln.m *Breaking of Hard rock *Concrete cutting of pavement *Sand Bedding *Pipelaying of 6″ HDPE Pipe- 120 ln.m *Backfilling *Laying of Warning tape Lanao: *Excavation works 3″ HDPE Pipe – 115 ln.m *Excvation works 2″ HDPE Pipe- 189.70 ln.m ACTIVITES: Tuble: *Excavation – 88ln.m *Breaking of Hard Rock *Concrete cutting of pavement *Sand bedding *Pipelaying of 3″ HDPE Pipe- 78 ln.m *Pipelaying of 4″ HDPE Pipe- 114 ln.m *Backfilling *Laying of Warning Tape Basdiot: *Excavation- 28.47 ln.m *Breaking of Hard rock *Concrete cutting of pavement *Sand Bedding *Pipelaying of 6″ HDPE Pipe- 120 ln.m *Backfilling *Laying of Warning tape Lanao: *Excavation works 3″ HDPE Pipe – 115 ln.m *Excvation works 2″ HDPE Pipe- 189.70 ln.m ACTIVITES: Tuble: *Excavation – 88ln.m *Breaking of Hard Rock *Concrete cutting of pavement *Sand bedding *Pipelaying of 3″ HDPE Pipe- 78 ln.m *Pipelaying of 4″ HDPE Pipe- 114 ln.m *Backfilling *Laying of Warning Tape Basdiot: *Excavation- 28.47 ln.m *Breaking of Hard rock *Concrete cutting of pavement *Sand Bedding *Pipelaying of 6″ HDPE Pipe- 120 ln.m *Backfilling *Laying of Warning tape Lanao: *Excavation works 3″ HDPE Pipe – 115 ln.m *Excvation works 2″ HDPE Pipe- 189.70 ln.m ACTIVITES: Tuble: *Excavation – 88ln.m *Breaking of Hard Rock *Concrete cutting of pavement *Sand bedding *Pipelaying of 3″ HDPE Pipe- 78 ln.m *Pipelaying of 4″ HDPE Pipe- 114 ln.m *Backfilling *Laying of Warning Tape Basdiot: *Excavation- 28.47 ln.m *Breaking of Hard rock *Concrete cutting of pavement *Sand Bedding *Pipelaying of 6″ HDPE Pipe- 120 ln.m *Backfilling *Laying of Warning tape Lanao: *Excavation works 3″ HDPE Pipe – 115 ln.m *Excvation works 2″ HDPE Pipe- 189.70 ln.m ACTIVITES: Tuble: *Excavation – 88ln.m *Breaking of Hard Rock *Concrete cutting of pavement *Sand bedding *Pipelaying of 3″ HDPE Pipe- 78 ln.m *Pipelaying of 4″ HDPE Pipe- 114 ln.m *Backfilling *Laying of Warning Tape Basdiot: *Excavation- 28.47 ln.m *Breaking of Hard rock *Concrete cutting of pavement *Sand Bedding *Pipelaying of 6″ HDPE Pipe- 120 ln.m *Backfilling *Laying of Warning tape Lanao: *Excavation works 3″ HDPE Pipe – 115 ln.m *Excvation works 2″ HDPE Pipe- 189.70 ln.m ACTIVITES: Tuble: *Excavation – 88ln.m *Breaking of Hard Rock *Concrete cutting of pavement *Sand bedding *Pipelaying of 3″ HDPE Pipe- 78 ln.m *Pipelaying of 4″ HDPE Pipe- 114 ln.m *Backfilling *Laying of Warning Tape Basdiot: *Excavation- 28.47 ln.m *Breaking of Hard rock *Concrete cutting of pavement *Sand Bedding *Pipelaying of 6″ HDPE Pipe- 120 ln.m *Backfilling *Laying of Warning tape Lanao: *Excavation works 3″ HDPE Pipe – 115 ln.m *Excvation works 2″ HDPE Pipe- 189.70 ln.m ACTIVITES: Tuble: *Excavation – 88ln.m *Breaking of Hard Rock *Concrete cutting of pavement *Sand bedding *Pipelaying of 3″ HDPE Pipe- 78 ln.m *Pipelaying of 4″ HDPE Pipe- 114 ln.m *Backfilling *Laying of Warning Tape Basdiot: *Excavation- 28.47 ln.m *Breaking of Hard rock *Concrete cutting of pavement *Sand Bedding *Pipelaying of 6″ HDPE Pipe- 120 ln.m *Backfilling *Laying of Warning tape Lanao: *Excavation works 3″ HDPE Pipe – 115 ln.m *Excvation works 2″ HDPE Pipe- 189.70 ln.m ACTIVITES: Tuble: *Excavation – 88ln.m *Breaking of Hard Rock *Concrete cutting of pavement *Sand bedding *Pipelaying of 3″ HDPE Pipe- 78 ln.m *Pipelaying of 4″ HDPE Pipe- 114 ln.m *Backfilling *Laying of Warning Tape Basdiot: *Excavation- 28.47 ln.m *Breaking of Hard rock *Concrete cutting of pavement *Sand Bedding *Pipelaying of 6″ HDPE Pipe- 120 ln.m *Backfilling *Laying of Warning tape Lanao: *Excavation works 3″ HDPE Pipe – 115 ln.m *Excvation works 2″ HDPE Pipe- 189.70 ln.m
07DecDecember 7, 2023 DESIGN AND BUILD OF CARRASCAL WATER SUPPLY SYSTEM IMPROVEMENT PROJECT (PHASE II)
07Nov Road Concreting of Farm to Market Roads, Dumanjug, Cebu Activity: *Concrete Pouring *Formworks *Concrete cutting *Hauling of water *Batching *Preparations of area for concrete pouring including Pison and Grader Activity: *Concrete Pouring *Formworks *Concrete cutting *Hauling of water *Batching *Preparations of area for concrete pouring including Pison and Grader Activity: *Concrete Pouring *Formworks *Concrete cutting *Hauling of water *Batching *Preparations of area for concrete pouring including Pison and Grader Activity: *Concrete Pouring *Formworks *Concrete cutting *Hauling of water *Batching *Preparations of area for concrete pouring including Pison and Grader
07Nov Proposed 350mm dia and 100mm dia DI, Transmission and Distribution Pipeline Project Activities: • Cutting of Existing Conrete Pavement @ Soong, Mactan Road • Pipe Detect for existing pipes with MCWD Team Proposed 350mm dia and 100mm dia DI, Transmission and Distribution Pipeline Project Proposed 350mm dia and 100mm dia DI, Transmission and Distribution Pipeline Project Proposed 350mm dia and 100mm dia DI, Transmission and Distribution Pipeline Project Proposed 350mm dia and 100mm dia DI, Transmission and Distribution Pipeline Project