Activities:
*Stripping of Scaffoldings @ Front Perspective, Left Perspective and Rear Perspective
* Installation of Stone Wall Cladding @ Main Entrance: Planters
*Installation of Cabinet Door Lock on Pipe Chase Casement Door @ 2nd Floor: Hallway; Upper ground Floor: Stock Room Door
*Application of Tile Grout @ 2nd Floor: Bedrooms 2 & 3 (Right Wing), Hallway (Right Wing)
*Application of 1st Coat Paint Finish @ 2nd Floor: Director’s Office along Hallway
*Installation of 2″ dia. PVC Downspout @ Main Entrance Canopy
*Full Welding of Stair Railings’ Web Member Joints @ 2nd Floor: Main Stairs
(Punch lists)
*Reapplication of White Sealant on Fixed Frosted Window @ Conference Room
*Installation of Fiberglass Ribbed Type Roof @ Main Entrance Canopy
*Cleaning of PVC Groove @ Meeting Lounge
*Application of Primer Paint on PVC Pipe @ Lower ground: Stock Room See less
Expansion of Annex Dormitory Building for Boys & Girls Design and Build)
Activities:
*Stripping of Scaffoldings @ Front Perspective, Left Perspective and Rear Perspective
* Installation of Stone Wall Cladding @ Main Entrance: Planters
*Installation of Cabinet Door Lock on Pipe Chase Casement Door @ 2nd Floor: Hallway; Upper ground Floor: Stock Room Door
*Application of Tile Grout @ 2nd Floor: Bedrooms 2 & 3 (Right Wing), Hallway (Right Wing)
*Application of 1st Coat Paint Finish @ 2nd Floor: Director’s Office along Hallway
*Installation of 2″ dia. PVC Downspout @ Main Entrance Canopy
*Full Welding of Stair Railings’ Web Member Joints @ 2nd Floor: Main Stairs
(Punch lists)
*Reapplication of White Sealant on Fixed Frosted Window @ Conference Room
*Installation of Fiberglass Ribbed Type Roof @ Main Entrance Canopy
*Cleaning of PVC Groove @ Meeting Lounge
*Application of Primer Paint on PVC Pipe @ Lower ground: Stock Room See less
Expansion of Annex Dormitory Building for Boys & Girls Design and Build)
ACTIVITIES:
*Demolition of 100mm Thick Lite Strong for Proposed Awning Window @ 2nd Floor: Bedroom 1 and 3 (Right Wing)
*Installation of Fire Reserved Tank’s Wall Formworks and Shoarings @ near Riprap
*Installation of 0.4mm thick Spandrel with Light Metal Framing @ Roof Deck
*Application of Joint Tape and Gypsum Putty in between Gypsum Boards @ 3rd Floor: Bedrooms 1-5 (Left and Right Wing), Family Rooms (Left and Right Wing); 2nd Floor: Director’s Office and Quarter
*Installation of Light Metal Franes for Ceiling Works @ 2nd Floor: Bedrooms 1-3 (Left Wing and Right Wing, Bedrooms 4 and 5 (Right Wing)
*Installation of 300x300mm Floor Tiles and 300x600mm Wall Tiles for T&B @ 3rd Floor: Bedrooms 1, 2, 3, 4 & 5 (Left Wing), Bedrooms 1, 2 and 4 (Right Wing)
*Installation of S4S Wood Handrail @ Main Stairs
*Installation of 9mm Thick Gypsum Board @ Upperground Floor: Dining Area, and Conference Room
*Piling of 4″ CHB @ Main Entrance
*Installation of Additional Steel Staircase @ Lowerground Floor (Left Wing)
Expansion of Annex Dormitory Building for Boys & Girls Design and Build (PHASE II)
Expansion of Annex Dormitory Building for Boys & Girls Design and Build (PHASE II)
Annex Dormintory Works:
*Concrete Pouring (Right Stair) – Upper Ground to 3rd Floor Completed
*Install of Litestrong Block
*Installation of Panel Board (2F)
*Chipping of wall for pvc conduits (Electrical Works)
*Installation of PPR for main line (Waterline)
*Application of Skimcoat
*Rectification