14MarNovember 10, 2021 Rehabilitation of School Buildings Completion of Louver Installation of GYM & Boys Dorm’s Fire Exit, and Painting of Walls & Bleachers of the project Rehabilitation of School Building (Design & Build Scheme) located in Philippine Science High School-Central Visayas Campus, Talaytay, Argao, Cebu Completion of Louver, Stairs Hand Rail & Steel Door Installation at Fire Exit of the project Rehabilitation of School Building in Philippine Science High School, Talaytay, Argao, Cebu Completion of Louver, Stairs Hand Rail & Steel Door Installation at Fire Exit of the project Rehabilitation of School Building in Philippine Science High School, Talaytay, Argao, Cebu Philippine Science High School – Central Visayas Campus Talaytay Argao REHAB OF SCHOOL BUILDINGS*CONTINUE INSTALLATION OF HANGERS *INSTALLATION OF BOOSTER PUMP*INSTALLATION OF PRESSURE TANK*INSTALLATION OF SCAFFOLDS FOR INSTALLATION PUMPS*CONCRETE POURING SLAB AT LEFT WING FIRE EXIT*FABRICATION OF I BEAMS*INSTALLATION OF I BEAMS*INSTALLATION OF ANCHOR BOLT FOR STAIR BASE PLATE*INSTALLATION OF STAIR BASEPLATE*INSTALLATION OF CHB *PLASTERING*APPLICATION OF SKIM COAT 20-005, rehab of school buildings*Installation of louver frame frontRemoval of existing frame (rear louver)Fabrication of stair step and stringerInstallation of STRINGER and stepsApplication of skimcoatInstallation of Door jamb REHAB OF SCHOOL BUILDINGS*CONTINUE INSTALLATION OF HANGERS *INSTALLATION OF BOOSTER PUMP*INSTALLATION OF PRESSURE TANK*INSTALLATION OF SCAFFOLDS FOR INSTALLATION PUMPS*CONCRETE POURING SLAB AT LEFT WING FIRE EXIT*FABRICATION OF I BEAMS*INSTALLATION OF I BEAMS*INSTALLATION OF ANCHOR BOLT FOR STAIR BASE PLATE*INSTALLATION OF STAIR BASEPLATE*INSTALLATION OF CHB *PLASTERING*APPLICATION OF SKIM COAT