SITE DEVELOPMENT under Design and Build Scheme

SITE DEVELOPMENT under Design and Build Scheme

Robo Gallery: You didn’t select any Robo Gallery item in editor. Please select one from the list or create new gallery
"We specialize in Design and Build scheme, providing single-source responsibility for the entire construction process". Activities: *Installation of Road Guardrail W-Beam @ Road 2: Sta. 0+000 - 0+036 (Right Side) ; Road 1: Sta. 0+010 - 0+025 (Right Side) *Installation of Concrete Sidewalk Formworks and Shoring's @ Road 1: Sta. 0+070 - 0+075 (Right Side); Road 2: Sta. 0+000 - 0+005 (Left Side) *Concrete Pouring of Swell @ Road 1: Sta. 0+010 - 0+020 (Right Side) *Application of Concrete Epoxy for Road Cracks
“We specialize in Design and Build scheme, providing single-source responsibility for the entire construction process”.
Activities:
*Installation of Road Guardrail W-Beam @ Road 2: Sta. 0+000 – 0+036 (Right Side) ; Road 1: Sta. 0+010 – 0+025 (Right Side)
*Installation of Concrete Sidewalk Formworks and Shoring’s @ Road 1: Sta. 0+070 – 0+075 (Right Side); Road 2: Sta. 0+000 – 0+005 (Left Side)
*Concrete Pouring of Swell @ Road 1: Sta. 0+010 – 0+020 (Right Side)
*Application of Concrete Epoxy for Road Cracks
Site Development (Design and Build Scheme)
ACTIVITIES:
*Transfer of pumpcrete
*Concrete pouring for retaining wall gridline 19-21
*Cleaning and set up of pumpcrete and pipes
*Installation of baseplate for signages
*Installation of Formworks 2nd lift for retaining wall 19-21
Completion of Louver Installation of GYM & Boys Dorm’s Fire Exit, and Painting of Walls & Bleachers of the project Rehabilitation of School Building (Design & Build Scheme) located in Philippine Science High School-Central Visayas Campus, Talaytay, Argao, Cebu

Philippine Science High School – Central Visayas Campus – Argao Cebu