*Concrete Pouring Activity for Retaining Wall (2nd Lift) and Foundatiom at Gl. 5-8, Drainage Wall and Top Slab
*Reinforcing Rebars for Retaining Wall , Beam 2 and Gitder Beam and Canopy
*Formworks Activity and Scaffodling Activity
*Installatiom of CHB and Plastering
*Fabrication of Column and Steel GratingSite Development (Design and Build Scheme) Activities *Installation of 4″CHB *Application of road markings *Housekeeping “Philippines Science High School Site Development project”
*Concrete Pouring for Slab, Beam and Columns at Gridline 13-17′
*Concrete Pouring for Retaining Wall at Gridline 17-18 Second Lift
*Installation of Chb
*Drainage Rebars and Excavation
*Excavation Works for Girder Beam
*Scaffolding Works at Gridline 17-20
*Fabrication of Rebars for Beam 2 and Girder Beam
*Application of Acqua Epoxy for Road Barrier Markings“Philippines Science High School Site Development project”
-Installation of Formworks and scaffoldings at Retaining wall grid 5-10
-Application of Paint at road barriers
-Application of Road markings
-Concrete pouring of Retaining Wall“Philippines Science High School Site Development project”
– Concrete pouring gridline 17-20
– Concrete pouring at ramp
– Installation of CHB
– Plastering at Ramp
– Installation of Formworks and Scaffolding
– Installation of rebars for slope protectionSITE DEVELOPMENT 2020 ACTIVITIES:
*Concrete Pouring for Column Second Lift GL. 5-6 and footing GL 5
*Reinforcing Works for Beams and Columns at GL 5-7
*Scaffolding Works and Formworks at Gridline 5-7
*Excavation Works at Gridline 6 -
SITE DEVELOPMENT 2020 ACTIVITIES:
*Concrete Pouring for Column Second Lift GL. 5-6 and footing GL 5
*Reinforcing Works for Beams and Columns at GL 5-7
*Scaffolding Works and Formworks at Gridline 5-7
*Excavation Works at Gridline 6 -
SITE DEVELOPMENT 2020 ACTIVITIES:
*Concrete Pouring for Column Second Lift GL. 5-6 and footing GL 5
*Reinforcing Works for Beams and Columns at GL 5-7
*Scaffolding Works and Formworks at Gridline 5-7
*Excavation Works at Gridline 6
-
*Excavation works for footing column at GL 5-12 *Installation of footing rebars at GL 5-12 *Installation of footing column rebars at GL 5-12 *Installation of Rebars for Girder at GL 1-4 *Installation of Formworks for Column *Installation of 4″ CHB at GL 5-10 *Formworks and Scaffolding Works *Concrete Pouring -
*Excavation works for footing column at GL 5-12 *Installation of footing rebars at GL 5-12 *Installation of footing column rebars at GL 5-12 *Installation of Rebars for Girder at GL 1-4 *Installation of Formworks for Column *Installation of 4″ CHB at GL 5-10 *Formworks and Scaffolding Works *Concrete Pouring -
Site Development 2020 Project Activities:
*Concrete Pouring for Beams GL. 5-6
*Concrete Pouring for Footing and Column at GL.6
*Scaffolding Works
*Excavation Works at GL. 10
*Formworks Activity
*Installation of Rebars for Girder Beam
*Installation of Rebars for Slab -
-
SITE DEVELOPMENT 2020 ACTIVITIES:
*CONCRETE POURING FOR COLUMN AT GRIDLINE 8-14 (7 COLUMNS)
*CONCRETE POURING FOR FOOTING AT GRIDLINE 10
*SCAFFOLDING WORKS AT GRIDLINE 8-10
*FORMWORKS AT GRIDLINE 8-10
*STRIPPING OF SIDINGS
*EXCAVATION AT GRIDLINE 17 AND 10
*INSTALLATION OF REBARS FOR BEAM 2, FOOTING AND COLUMNS
*EXCAVATION WORKS FOR DRAINAGE