16AprSeptember 5, 2024 CONSTRUCTION OF WATER SUPPLY SYSTEM AT BRGY. OVERLAND, BUENAVISTA, BOHOL Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars Activities: • Scraping of river bed using backhoe for boulders and sand • Hauling/stock piling of boulders and sand from the river • Installation of formworks for the Dam’s base • Removing of lose soil from the Dam area preparation for rock drilling • Cutting of anchor bars