Design Construction Installation of Rainwater Collection System
Activities:
*Installation of formworks and scaffoldings
*Concrete pouring left wing cistern tank
Activities:
-Concrete pouring walls and top slab of cistern tank
Activities:
*Construction of Storm Drainage Canal
Design Construction Installation of Rainwater Collection System
Activities:
*Backfilling works
*Masonry works Drainage level 1
*Masonry works Drainage Grid D & C
*Irrigation pillars
*Admin building sprinkler pipes *fabrication
*Drainage canal cover fabrication
*Stormdrain line fit out
Activities
*Installation of IBC Tank
*Laying of CHB for Drainage Canal GRID D
*Demolition works right wing Storm drain line
*Excavation Storm Drain line Right wing
Design Construction Installation of Rainwater Collection System
Activities:
– Filling of CHB
– Excavation of footing for Pillars
– Installations of main
distribution water supply
#63mm PE hose
#50mm PE hose
#40mm PE hose
#32mm PE hose
– Electrical pipe laying from
pumphouse to Panel
– Installation of Pillars
– Plastering See less
Water Supply And Distribution System
Water Supply and Distribution System
Retaining wall level 1 and level 2
Irrigation Sprinkler
Irrigation Sprinkler
Pneumatic 3Hp Booster Pump (2), 1Hp Booster Pump (1), 650L and 200L Pressurized Tank Complete with Plumbing Fixtures and Accessories
Pump House
RCPC 20cm Inside Diameter
Irrigation Pillars
Irrigation canal
HDPE IBC 1000L Plastic Tank
Electrical Works
15 Cubic Cistern Tank
Design Construction Installation of Rainwater Collection System