15SepSeptember 16, 2022 Design Construction Installation of Rainwater Collection System Activities: *Installation of formworks and scaffoldings *Concrete pouring left wing cistern tank Activities: -Concrete pouring walls and top slab of cistern tank Activities: *Construction of Storm Drainage Canal Design Construction Installation of Rainwater Collection System Activities: *Backfilling works *Masonry works Drainage level 1 *Masonry works Drainage Grid D & C *Irrigation pillars *Admin building sprinkler pipes *fabrication *Drainage canal cover fabrication *Stormdrain line fit out Activities *Installation of IBC Tank *Laying of CHB for Drainage Canal GRID D *Demolition works right wing Storm drain line *Excavation Storm Drain line Right wing Design Construction Installation of Rainwater Collection System Activities: – Filling of CHB – Excavation of footing for Pillars – Installations of main distribution water supply #63mm PE hose #50mm PE hose #40mm PE hose #32mm PE hose – Electrical pipe laying from pumphouse to Panel – Installation of Pillars – Plastering See less Water Supply And Distribution System Water Supply and Distribution System Retaining wall level 1 and level 2 Irrigation Sprinkler Irrigation Sprinkler Pneumatic 3Hp Booster Pump (2), 1Hp Booster Pump (1), 650L and 200L Pressurized Tank Complete with Plumbing Fixtures and Accessories Pump House RCPC 20cm Inside Diameter Irrigation Pillars Irrigation canal HDPE IBC 1000L Plastic Tank Electrical Works 15 Cubic Cistern Tank Design Construction Installation of Rainwater Collection System